November, Changes Route Of KRL Tested
VIVAnews -Jabodetabek Commuter Railway LTD. (KCJ) will change the route KRL.
If now has 37 routes travel KRL, it later only has six routes. Plan a new route will be applied at the end of this year.
The Secretary of the company PT KCJ Prosperous Syaheran, revealed that the rerouting was done so that it doesn't happen again crossing (a cross). As in Manggarai station. As KRL from Bogor in, all passengers from Jatinegara will wait long enough.
During this time, KRL majoring in Tanah Abang-City and Bogor-Kota also often intersect at Manggarai station. "With the efficiency of the time, it is hoped in this way can increase the frequency of train travel," said prosper in conversation with VIVAnews.com, Thursday, October 27, 2011.
In order to prepare for the changes to the route, a number of things being done including the renovation of the Manggarai Station. The tests will be carried out in November. "The plan we did three times in the tests," he said.
As for the effective operation of six routes that route 1 cross Bogor-Manggarai-Tanah Abang-Duri-Jakarta Kota-Jatinegara. Route 2 passing long-Parung-Tanah Abang-Serpong.
Then Route 3 passes through the area-thorns. Route 4: Tanjung Priok-Jakarta Kota.
Route 5: the Bekasi-Jatinegara-Manggarai-Jakarta Kota, Manggarai and 6-Bogor-Jakarta Kota. "The route to cross Bogor plus remember passengers to this most majors," light of him.
Destination train station the city only stop at Manggarai station. After that passengers who wish to, Tanah Abang, Bekasi and other changing trains. "Concerns the intersection of yesteryear, system of a double track will also be built," he added.
Prosperous explains, with the change of route of KRL, there will be five Stations in Jakarta who became a transit station, Manggarai, Jatinegara, Tanah Abang, Thorns and Jakarta City.
• VIVAnews
Paid road Tested in 10 main street
VIVAnews – Deputy Head of DPRD DKI Jakarta Triwisaksana says, the policy paid road vehicles restrictions or electronic road pricing (ERP) has been entered in the Regional Spatial Plan Change (RTRW) in 2030.
He explains, for the initial phase will be implemented in ten ERP subdistrict, Tanah Abang, Menteng Pulo, Kebayoran Baru, Tebet, Matraman, Senen, Gambir, Tambora, Sawah Besar, and Taman Sari Water Castle. "Map of the planned restrictions on traffic in the RTRW described in the center of the city," said Triwisaksana in Jakarta, Wednesday 7 September 2011.
Triwisaksana expresses support for legislation to limit the use of the vehicle has been made with the endorsement of the Change RTRW. In the Change RTRW are arranged in a macro on ERP. "Stay later detail program will certainly be discussed again," he added.
However, he said, paid still bump realiasasi the way the legal umbrella of the Ministry of finance. Whereas, President Susilo Bamabng Yudhoyono (SBY) have signed a Government Regulation (PP) of ERP on 21 July.
The previous Governor of DKI Jakarta, Fauzi Bowo hope PP on the control of traffic on a particular area can soon be published. After that will be followed up with Change For ERP. For handling capital congestion problem very urgent at the moment.
The head of the Department of transportation Jakarta, Pristono Is added, the legal umbrella is still not complete because the ERP needs to resolve a few things. In particular, related provisions of the tax and retrubusi ERP areas that would later be transmitted where.
For that need government regulation of ACT 3/2009 of the tax and Levy County. The Ministry of transportation, advanced Pristono, wanted the infusion of the ERP was later restored to the same field.
The aim to improve the quality of infrastructure and transport services. If channeled into another post then it is very hard in improving the Transport Ministry. PP derivative is expected at the end of this year was completed covered Kemenkeu. So at the beginning of the year can be prepared the means and the infrastructure. "Fastest ERP can be implemented in late 2012 or early 2013," brightening. (adi)
The driver in a number of Terminal Start Tested Urine
VIVAnews -towards the peak currents go, at least 50 bus drivers across the province was undergoing health tests on Terminal Poris Plawad, Tangerang. Objective tests to ensure the return current for serving drivers free of alcohol and narcotics and always in good health.
"The driver is obliged to undergo medical tests for the sake of the safety during the journey, pemudik" Coordinator of the medical examination Driver from the Ministry of health, Budi Raharjo, VIVAnews.com, to Wednesday, August 24, 2011. The test starts at around 09: 00 until 14: 00 pm.
The examination tests include health, tempered test urine, alcohol levels, blood sugar and blood pressure. Sugar and blood pressure tests to ensure the health of the driver for the journey. "Far from the results of tests carried out, the driver deserves to drive," said Budi.
His opinion, if the officer finds the driver who suffered health impairment and consume alcohol and narcotics, then they are forbidden to travel. "The driver in question should be replaced by another driver," he explained.
Health tests also traveled by bus drivers in an 85 Pulogadung and Kampung Rambutan Terminal, East Jakarta, yesterday.
"Hopefully it is able to suppress the occurrence of the number of accidents triggered by an inconsiderate driver SWIG liquor before driving," adds Bob.
He exposes the driver of the bus, urine is examined in the laboratory in the area of the terminal. In General, this negative urine test results, so that the driver is allowed to drive a bus transporting pemudik.
Report: Muhammad Iyus | Tangerang